| HYDRAULIC POLE (DEPARTMENT OF STEEL AND SUSPENSION WORKS) |
| CIRCUIT BREAKERS (50 SETS) |
| FLAME-PROOF EQUIPMENT (90 SETS) |
| REAR-DISCHARGE LOADING MACHINE (10 SETS) |
| MINER'S HEAD LAMP (10,000 SETS) |
| IGNITION MAGNETO (4 SETS) |
| BAND ATTACHMENT MACHINE (10 SETS) |
| DUAL CHAIN CONVEYOR CHANNEL SIDE SUPPORT (30.000 M) |
| DRILLING MACHINE AND EQUIPMENT (2 SETS) |
| SYDRAULIC GEARBOX (10 SETS) |
| FEASIBILITY REPORT AND PROJECTION (MODERNISATION OF WASHERY, ZONGULDAK - CATALAGZI) |
| CELIK-ARMUTCUK REHABILITATION PROJECT |
| CONVEYOR BAND (1.800 M) |
| X-RAY INSTRUMENT (1 SET) |
| CYLINDER PIPE (PUSHING PISTON CYLINDER) (8 SETS) |
| STEEL FIBER (35.000 PCS) |
| CHANNEL PROFILE (DUAL CHAIN CONVEYOR CHANNEL SIDE PROFILE) (15.000 M) |
| HELMET (8.500 PCS) |
| ELECTRIC MOTOR |
| MINER'S HELMET |
| SIGNALISATION SYSTEM |
| AIR COMPRESSOR |
| SOLID WASTE CARRIAGE SYSTEM |
| CEMENT BLOCK PRODUCTION |